Emerging brand
First style, first run. We cost it with you before you commit, and keep the sample loop short.
Start with a samplePrivate label, OEM and ODM manufacturing from Sidi Ghanem, Marrakech. Leather, vegan alternatives and technical textiles, from first sketch to packed carton.
Who we work with
First style, first run. We cost it with you before you commit, and keep the sample loop short.
Start with a sampleRepeat programmes and seasonal drops, held to a quality bar that does not move between runs.
Check capacityVolume, a fixed date and brand guidelines to follow. Packed, labelled and shipped to your spec.
Request a quoteServices
01
From a reference photo or a mood board to a buildable style, costed as we go.
Silhouette, proportion, construction method, hardware plan.
02
Dimensioned drawings, construction notes, a bill of materials and a stitch spec.
Yours to keep, and portable to any factory.
03
First sample, fit sample, counter sample. Every change logged against the pack.
Typical loop: 2 to 3 rounds before sign-off.
04
Tanneries, mills and hardware makers we already buy from, with swatches to approve.
Nominated suppliers welcome.
05
Embossing, debossing, hot stamping, custom hardware, linings, woven and leather labels.
Tooling cost quoted once, reused across runs.
06
Cutting, skiving, edge finishing, assembly and closing on dedicated lines.
Capacity: 5,200 units a month.
07
Four checkpoints, an AQL plan you agree in advance, and a report with photographs.
Third-party inspection on request.
08
Dust bags, boxes, hang tags, barcodes and retail-ready or direct-to-consumer packing.
Recycled and FSC stock available.
09
Export paperwork, freight booking, and delivery to your warehouse or 3PL.
EXW, FOB, CIF or DDP.
The process
01
Brief & feasibility
1 day
02
Design & development
3 days
03
Tech pack
3 days
04
Sourcing
4 to 8 weeks
05
Sampling loop
2 weeks
06
Pre-production sign-off
2 days
07
Production & QC
4 to 6 weeks
08
Packing & delivery
1 week
Materials

Full-grain, vegetable-tanned, suede, split

PU, bio-based coatings, cork, apple and cactus

Recycled nylon, cotton canvas, ripstop, technical weaves

Zips, buckles, feet, magnets, custom plates
Capacity
5,200
Units per month
50
Minimum order, per style
72
Hours to first sample
4 to 6
Weeks, bulk lead time
2018
Making bags since
Illustrative projects
Composite scenarios with representative figures, not named clients. All six, and why they are framed this way.

Illustrative · Established brand
A woven calf tote failing at the handle join. Re-cut the weave across the load, move the stress into a reinforced gusset, hold the retail price.
1,200 units · 14 weeks · returns down to 0.4%

Illustrative · Emerging brand
A first run costed three ways before tooling. The brand takes the middle spec, drops a pocket to fund a better zip, and launches on the date it promised.
300 units · 3 colourways · 9 days early

Illustrative · Corporate
A gift programme with a date that cannot move and a strict brand book. Debossed, boxed and barcoded in house, then split into eleven shipments from one batch.
2,500 units · 11 destinations · 0 late

The atelier
Cutting, skiving, edge finishing, assembly, closing, finishing and packing all sit in the same building. Nothing goes out to a broker, so a question about stitch count is answered the same day.
54
Machinists
12
Production lines
620
m² of floor
Instead of badges
Audits welcome, announced or not Every supplier named Balance due after inspection How we workA sketch, a photo of a bag you like, or a finished tech pack. Any one of them is enough to start. We reply within 24 working hours.